01708 860 049
Priming Mortar
How to calculate the estimated amount of SteinTec tuffbond bonding / priming mortar required.

Priming Mortar
Priming Mortar Consumption Calculation

The consumption of priming or bonding mortar is approximately 1.5 kg/m² per layer applied.

If priming mortar is to be applied both to the surface of the roadbase and to the underside of paving elements, consumption is approximately 3 kg/m²