1. 01708 860 049
  2. webenquiries@tuffbau.com

Calculator

TUFFTOP JOINTING MATERIAL CALCULATOR

Fill in the empty boxes to find out exactly how much jointing material your project will use

mm

mm

mm

mm

Joint mortar consumption: 0 kg m²

Order Quantity Kg 0 Kg

Number of 25kg sacks of tufftop 0

Note: The calculation here allows for normal wastage and is based on the use of smooth-sided paving. Cropped setts or fettled slabs may require significantly more jointing material.

TUFFBED 2-PACK BEDDING CALCULATOR

Tuffbed 2-pack is made by mixing 1 part tuffbed mothermix with 4 parts tuffgrit aggregate by weight, it is important that the correct ratio is maintained. Therefore you will require:

mm

Tuffbed 2-pack Mothermix: 0 Kg x 25 Bags 0 Kg

Tuffbed 2-pack Aggregate: 0 Kg x 25 Bags 0 Kg

Total Mothermix and Tuffgrit 0 Kg x 25 Bags 0 Kg


TUFFBOND PRIMING MORTAR CALCULATOR

Tuffbond significantly improves the adhesion of paving elements to the bedding mortar, and the adhesion of bedding mortar to the concrete base beneath (if applicable). Tuffbond should be mixed to a porridge consistency and applied to the concrete base with a dense brush or tiling trowel before the bedding is poured; similarly to the underside of each cleaned paver (wiped with a damp sponge), immediately before laying.

Tuffbond

If using 1 layer: 0 Kg x 25 Bags 0 Kg

If using 2 layer: 0 Kg x 25 Bags 0 Kg